Skoda Felicia

since 1994 release

Repair and operation of the car



Skoda Felicia
+ Cars of the Skoda Felicia brand
+ Maintenance instruction
+ Routine maintenance
- Repair of the engine
   + Repair without extraction from the car of the petrol engine of 1.3 l
   + Repair without extraction from the car of the petrol engine of 1.6 l
   - Repair without extraction from the car of the diesel engine
      Description of the main knots and mechanisms
      Reduction of the piston of the first cylinder in the provision of the top dead point (TDP) of the end of a step of compression
      Check of tightness of combustion chambers
      Removal and installation of a belt of the GRM drive and its covers
      Removal and installation of a natyazhitel and cogwheels of a belt of the GRM drive
      Removal, installation and adjustment of a tension of a belt of the drive of auxiliary units
      Removal and installation of a cover of a head of cylinders
      Replacement of an epiploon of the camshaft
      Replacement of an epiploon of an intermediate shaft
      Replacement of epiploons of a bent shaft
      Removal and installation of a head of cylinders assembled with the inlet pipeline and a final collector
      Check of serviceability of functioning of hydraulic pushers
      Flywheel - removal, check and installation
      Support of the power unit - check and replacement
      The pallet - removal, check and installation
      Removal and installation of the oil pump and assembly of a maslozabornik
   + Dismantle of the power unit and capital repairs of the engine
+ Cooling systems, heating
+ Power supply system
+ Engine electric equipment
+ Coupling
+ Transmission
+ Power shafts
+ Brake system
+ Suspension bracket and steering
+ Body and finishing of salon
+ Onboard electric equipment



Removal and installation of the oil pump and assembly of a maslozabornik

Lubrication system of the diesel engine

1 — the Stopper of a maslozalivny mouth
2 — Sealing laying
3 — the Measuring probe
4 — Sealing laying
5 — the Sensor switch of a control lamp of pressure of oil
7 — the Arm of an oil filter
8 — the Bolt of fastening of an arm
9 — Consolidation
10 — the Sealing ring
11 — the Heat exchanger
12 — the Nut of fastening of the heat exchanger

13 — the Oil filter
14 — the Oil jet of a rod
15 — the Bolt of fastening of a jet
16 — Maslootrazhatel
17 — Maslootrazhatel
18 — Gear wheels of the oil pump
19 — the Cover
20 — the Fixing bolt
21 — Maslozabornik
22 — the case Pallet
23 — the Drain stopper


Components of the oil pump

1 — pump Gear wheels
2 — a pump Cover

3 — the Sealing ring
4 — Maslozabornaya a tube


The lubrication system - the general information

In the considered engine the combined lubrication system with a full-line oil filter is used. The full volume of the filled-in oil makes 4.5 l.

Necessary working pressure of oil is created by the gear oil pump. Width of gear wheels makes 36 mm. Maslozabornik unites to the pump through sealing laying. The working size of pressure of oil in system makes 0.57 ÷ of 0.67 MPas. At excess of admissible value there is an opening of the reducing valve of the pump.

The sensor switch of a control lamp is fixed on an arm of an oil filter.

Cooling of oil is made in the heat exchanger connected to the engine cooling system.

The oil pump and assembly of a maslozabornik are located in the engine case pallet. The drive of the pump is carried out from the intermediate shaft rotating with a frequency equal to a half of frequency of rotation of a bent shaft.

REMOVAL

 PERFORMANCE ORDER

1. Remove the engine case pallet (see the Section Pallet - removal, check and installation).
2. Turn out bolts of fastening of the pump to the basis of the block of cylinders.
3. Omit assembly of the pump with a maslozabornik, having separated it from the block. At the corresponding complete set remove a plate of a maslootrazhatel.

CHECK

 PERFORMANCE ORDER

1. Give screws of fastening of a flange of interface and pick up the phone of a maslozabornik. Remove a sealing ring. Turn out fixing screws and uncover the pump.
2. Carefully clean the pump and check a condition of teeths of its gear wheels.

3. For assessment of size of a side play of gearing rotate gear wheels in different directions. Perform measurement and compare its results to requirements of Specifications.

4. By means of a steel line and the probe of lezviyny type define an axial side play of landing of gear wheels. Compare result to requirements of Specifications.

5. In case of an exit of results of measurements out of limits of admissible values the pump is subject to replacement.

INSTALLATION

 PERFORMANCE ORDER

1. Establish a pump cover, screw and tighten fixing screws with the required effort.
2. Install assembly of a maslozabornik on the pump (do not forget to replace a sealing ring). Tighten fixing screws with the required effort.
3. Install the pump on the block of cylinders, screw and tighten fixing bolts with the required effort.
4. Install into place the case pallet.