Skoda Felicia

since 1994 release

Repair and operation of the car



Skoda Felicia
+ Cars of the Skoda Felicia brand
+ Maintenance instruction
+ Routine maintenance
- Repair of the engine
   + Repair without extraction from the car of the petrol engine of 1.3 l
   - Repair without extraction from the car of the petrol engine of 1.6 l
      Description of the main knots and mechanisms
      Reduction of the piston of the first cylinder in the provision of the top dead point (TDP) of the end of a step of compression
      Check of compression pressure - an order of carrying out and interpretation of results
      Removal and installation of a belt of the GRM drive and its covers
      Removal, check of a state and installation of cogwheels and natyazhitel of a belt of the GRM drive
      Removal, installation and adjustment of effort of a tension of a belt of the drive of auxiliary units
      Removal and installation of a cover of a head of cylinders
      Replacement of an epiploon of the camshaft
      Replacement of epiploons of a bent shaft
      Removal and installation of a head of cylinders assembled with the inlet pipeline and a final collector
      Check of serviceability of functioning of hydraulic pushers
      Removal, check of a state and installation of a flywheel
      Check of a state and replacement of support of the power unit
      Removal and installation of the pallet of a case of the engine
      Removal and installation of the oil pump and maslozabornik
   + Repair without extraction from the car of the diesel engine
   + Dismantle of the power unit and capital repairs of the engine
+ Cooling systems, heating
+ Power supply system
+ Engine electric equipment
+ Coupling
+ Transmission
+ Power shafts
+ Brake system
+ Suspension bracket and steering
+ Body and finishing of salon
+ Onboard electric equipment



Removal and installation of the pallet of a case of the engine

REMOVAL

 PERFORMANCE ORDER

1. Park the car on a plain horizontal surface, whenever possible with a hard coating. Cock the parking brake and prop up wedges back wheels.
2. A car front also establish to Poddomkratta it on props.
3. Disconnect a negative wire from the battery.
4. Merge motive oil.
5. Disconnect a reception pipe of system of production of the fulfilled gases from a flange of a final collector (see the Head the Power supply system). Having removed from rubber suspensions, lower sections of system of production of the fulfilled gases, having provided adequate access to the case pallet.

When lowering system of production of the fulfilled gases try not to allow l-probe electrical wiring tensions - it will be correct to disconnect it previously.

6. Moving on pallet perimeter, in stages weaken and turn out fixing bolts.

7. Having tapped a palm, separate the pallet from the block of cylinders and take it from under the car.
8. Taking an opportunity, check a state and passability of a tube and the mesh filter of a maslozabornik of the pump. In case of need remove the pump (see the Section Removal and installation of the oil pump and a maslozabornik) and clean (or replace) a maslozabornik.

INSTALLATION

 PERFORMANCE ORDER

1. Carefully smooth out the interfaced surfaces, having completely removed from them the remains of material of old laying or sealant. Then wipe surfaces with the rags moistened in acetone.
2. Impose on the interfaced surface of the pallet a pillow of silicone sealant with the section of Ø 2 ÷ of 3 mm, leading round fixing openings from within.

 It is not necessary to be zealous excessively, imposing sealant - hit of surplus in the pallet of a case can lead to violation of passability of the mesh filter of a maslozabornik and, as a result, development of oil starvation of internal components of the engine.

3. Having imposed sealant, at once press the pallet to the block. Not to allow inaccuracies, temporarily screw couple of directing M6 hairpins in bolted openings of the block. Tighten fixing bolts by hand.
4. In stages tighten bolts with the required effort. Before filling of the engine with oil wait time necessary for sealant hardening.
5. Hang out sections of system of production of the fulfilled gases and connect to a final collector its reception pipe (see the Head the Power supply system).
6. Lower the car on the earth and fill in necessary amount of engine oil of the required grade in the engine.